Construction and 5 years of Operation and Maintenance of Water Supply System in Hussainabad (Intake works, Rising main, 9.5 MLD Water treatment plant, Clear water main, Overhead reservoirs, Distribution network and House service connections)
Item Details:
- Organisation: Asian Development Bank
- Reference Number: JURLIP/02
- Published: 27 August 2019
- Deadline: 10 October 2019; at 15:00 hours
- Time zone: Local time
- Street: Pragati Sadan, Kutchery Chowk
- City: Ranchi
- Country: India
- Zip/Postal Code: 834001
- Expires: This ad has expired
Item Description:
The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth and cooperation in one of the poorest regions in the world.
ADB assists its members, and partners, by providing loans, technical assistance, grants, and equity investments to promote social and economic development.
The Government of India has applied for financing from the Asian Development Bank (ADB) toward the cost of Jharkhand Urban Resilience and Livability Improvement Project (JURLIP). Part of this financing will be used for payments under the contract named above. Bidding is open to bidders from eligible source countries of ADB.
The Jharkhand Urban Infrastructure Development Company (JUIDCO) Ltd. represented by the Project Director, Jharkhand Urban Resilience and Livability Improvement Project, (Employer) invites sealed Bids from eligible Bidders for the “Construction and 5 years of Operation and Maintenance of Water Supply System in Hussainabad (Intake works, Rising main, 9.5 MLD Water treatment plant, Clear water main, Overhead reservoirs, Distribution network and House service connections)”. The completion period is 730 days (inclusive of 90 days of trial and run period) thereafter 1,825 days of Operation and Maintenance concurrent with 365 days of Defect Liability Period.
Only eligible Bidders with the following key qualifications should participate in this bidding:
- Minimum average annual construction turnover of INR 388 million calculated as total certified payments received for contracts in progress or completed, within the last five (5) years.
As a minimum, the Bidder’s net worth for the last year calculated as the difference between total assets and total liabilities should be positive. - Participation as a contractor, Joint Venture partner, or Subcontractor, in at least one (1) water supply distribution contract, having WTP as component, that has been successfully or substantially completed within the last seven (7) years and that is similar to the proposed works, where the value of the Bidder’s participation exceeds INR 320 million.
Further details are indicated in the ‘Section 3 – Evaluation and Qualification Criteria’ of the Bidding document.
Open Competitive Bidding – National will be conducted in accordance with ADB’s Single-Stage: Two-Envelope bidding procedure and is open to all Bidders from eligible countries as describe in the Bidding Documents.
Verified user
Related Ads
Some other Tender Notice ads that you might be interested in...
Security Guard and Reception/Switchboard services for the premises of the E...
The European Commission, Directorate General Communications, referred to below as the contracting authority, is planning to award the contract(s) resulting from the above procurement procedure. […]
2022-05-10
Construction of Additional Drainage Network, including pipe culverts to con...
The Government of Mozambique has received a loan from the African Development Fund (ADF) towards the cost of the Baixo Limpopo Irrigation and Climate Resilience […]
2018-11-26
Acquisition des engins et équipements agricoles
Le Gouvernement de la République Centrafricaine a reçu un financement de la Banque Africaine de Développement (BAD) ci-après dénommée la Banque pour financer Projet d’appui […]
2021-07-29