Cañaveral-Río Lindo Hydropower Complex Rehabilitation and Uprating Project
Item Details:
- Organisation: Inter-American Development Bank
- Reference Number: HO-L1102
- Published: Nov 22, 2016
- Deadline: 17/Jan/2017
- Time zone: Washington DC (Local Time)
- Street: 1300 New York Avenue
- City: Washington, D.C. 20577, USA
- State: District of Columbia
- Country: United States
- Zip/Postal Code: 20577
- Expires: This ad has expired
Item Description:
The objective of the project is to recuperate and to conserve the power generation capacity from renewable energies, contributing to energy security, through the improvement of the efficiency and the extension of the lifespan of the power generation and transmission infrastructure. The project has two components: i) power generation and transmission rehabilitation and ii) strengthening of the ENEE’s generation business unit.
Verified user
Related Ads
Some other Tender Notice ads that you might be interested in...
Design, Manufacture, Testing, Supply, Installation & Warranty of 50,00...
The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]
2019-03-21
Provision of Advisory Services to the European Commission via a European Ce...
The European Commission, Directorate General Employment, Social Affairs and Inclusion, (referred to below as the contracting authority) is planning to award the contract(s) resulting from […]
2019-11-11
Production of Video Clips in Motion Design
L’Organisation internationale pour les migrations (OIM) est une organisation intergouvernementale créée en 1951 et attachée au principe selon lequel une migration humaine et ordonnée profite […]
2019-07-09
















