Welcome, visitor!   Login

Menu Post an Ad

Construction of Suluova Wastewater and Stormwater Project

EU_Logo

Item Details:

  • Organisation: European Union
  • Reference Number: NEAR/ANK/2022/EA-OP/0157
  • Published: 21/10/2022
  • Deadline: 26/01/2023 at 14:00 hours
  • Time zone: Local time
  • City: Ankara
  • Country: Turkey
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2022-10-24

    Item Description:

    The Mission of the Directorate-General for Neighbourhood and Enlargement Negotiations (DG NEAR) is to take forward the EU’s neighbourhood and enlargement policies, as well as coordinating relations with EEA-EFTA countries insofar as Commission policies are concerned. DG NEAR works closely with the European External Action Service and the line DGs in charge of thematic priorities.

    By implementing assistance actions in Europe’s eastern and southern neighbourhood, DG NEAR supports reform and democratic consolidation, and strengthens the prosperity, stability and security around Europe. DG NEAR helps to promote EU values, policies and interests in this region, and to contribute to developing the special relationship of the EU with its neighbouring countries.

    Subject of the contract

    The subject of this contract is the Construction of Suluova Wastewater and Stormwater Project.

    The call for tenders is split into 2 (two) lots:

    Lot 1: Construction of Suluova Wastewater Treatment Plant

    The works covered under this contract includes the construction of a new WWTP for Suluova within the border of allocated WWTP area and construction of treated wastewater discharge line to Tersakan Creek. Suluova WWTP shall be an activated sludge plant for nitrogen and phosphorus removal. Sludge stabilization shall be accomplished within the activated sludge tanks as part of the extended aeration process. Suluova WWTP is designed as a single stage plant which serve to 30.064 p.e. for 2033 and 42.950 p.e. for 2048. Daily average flow rate of the plant to be constructed shall be 10,098 m3/day. Lot 1 work will be implemented under ‘FIDIC Conditions of Contract for Plant and Design-Build’ (FIDIC Yellow Book First Edition 1999). This Contract includes the design and construction of the second stages of the WWTP. Additionally,the Contractor will also be responsible for start-up of the plant, commissioning, operational training of the End Recipient’s personnel and hand-over to the Municipality of the complete WWTP ready for operation.

    Lot 2: Construction of Suluova Stormwater Network

    The scope of works consists of construction of approximately 25,510 m stormwater lines (approx. 23,686 m stormwater network made up of Φ300-1000 mm concrete/reinforced concrete lines and approx. 1,824 m stormwater network made up of box culverts with inner dimensions 1.00×1.00, 1.50×1.00 m and 2.50×1.00 m); construction of approx. 345 m of special crossing of culvert, river, highway etc. by pipe-jacking and/or horizontal drilling; supply, installation and construction of 894 gully connection lines; construction of 596 manholes of which 19 manholes are special type RC manholes; preparation of stormwater network as-built plans for constructed system. Lot 2 work will be implemented under ‘FIDIC Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer’ (FIDIC Red Book First Edition 1999).

    Download all available documents in: [ZIP] English (en)

    No Tags

      

    Listing ID: 65363570e84111e6

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    eu-logo

    Provision of external assistance (ICT and administrative external support s...

    The European Union Agency for the operational management of large scale IT systems in the area of freedom, security and justice, (referred to below as […]

    2019-05-08

    adb-logo_copy

    Design and Construction of Tunnels by TBM from near New Ashok Nagar DN Ramp...

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]

    2019-11-11

    FRONTEX_Logo

    Provision of Transportation Car Rental Services in Romania, Moldova, Hungar...

    The European Border and Coast Guard Agency (FRONTEX), referred to below as the contracting authority, is planning to award the contract resulting from the above […]

    9 hours ago

    Listing Opportunities

    Featured Tender

    Innovative Solutions

    error: Content is protected !!