Welcome, visitor!   Login

Menu Post an Ad

Construction of WWTP and Rehabilitation and Upgrading of the Sewerage Network in the Municipality of Bitola

EU_Logo

Item Details:

  • Organisation: European Union
  • Reference Number: NEAR/SKP/2022/EA-OP/0042
  • Published: 16/11/2022
  • Deadline: 21/02/2023 at 12:00 hours
  • Time zone: UTC+01:00
  • Street: Dame Gruev 12
  • City: Skopje
  • Country: North Macedonia
  • Zip/Postal Code: 1000
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2022-11-16

    Item Description:

    The Mission of the Directorate-General for Neighbourhood and Enlargement Negotiations (DG NEAR) is to take forward the EU’s neighbourhood and enlargement policies, as well as coordinating relations with EEA-EFTA countries insofar as Commission policies are concerned. DG NEAR works closely with the European External Action Service and the line DGs in charge of thematic priorities.

    By implementing assistance actions in Europe’s eastern and southern neighbourhood, DG NEAR supports reform and democratic consolidation, and strengthens the prosperity, stability and security around Europe. DG NEAR helps to promote EU values, policies and interests in this region, and to contribute to developing the special relationship of the EU with its neighbouring countries.

    Subject of the contract

    The contract shall cover the following: Design and construction of WWTP for 112,474 PE with total daily average flow of approximately 27,090 m3/day and extension 375 m of the existing main collector. The WWTP to be designed and constructed should be an activated sludge plant with primary clarifiers and anaerobic sludge stabilization in sludge digester. Works will be implemented following PRAG and FIDIC Conditions of Contract (“Yellow Book”, 1999 edition).Works on the sewerage network will include:- construction of approximately 9 km new sewerage network- reconstruction of approximately 13 km existing sewerage network – design and construction of two pumping stations and pressure pipes of around 5.6 km, and – design and construction of the main sewerage collector at Shirok sokak and Solunska street with the method of micro-tunneling with approximate length of 325 m. Works on the sewerage network will be implemented under FIDIC Conditions of Contract (“Red Book”, 1999 edition).

    Download all available documents in: [ZIP] English (en)

    No Tags

      

    Listing ID: 506374bef6857dd

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    EEA_Logo

    Purchase of a HubSpot License and Provision of Ancillary Services to the Eu...

    The European Environment Agency (EEA), referred to below as the contracting authority, is planning to award the contract(s) resulting from the above procurement procedure. The […]

    2022-09-12

    adb-logo_copy

    Construction, Supplying, and Installing Equipment of Water Supply System in...

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]

    2020-05-14

    eu-logo

    Provision of Reception and Switchboard Management and Hosting Services

    The European Medicines Agency (referred to below as ‘EMA’ or ‘the Agency’) is a decentralised agency of the European Union (EU) based in Amsterdam, the […]

    2019-06-12

    Listing Opportunities

    Featured Tender

    Innovative Solutions

    error: Content is protected !!