Welcome, visitor!   Login

Menu Post an Ad

Construction of Wastewater Collection Network

adb-logo_copy

Item Details:

  • Organisation: Asian Development Bank
  • Reference Number: CW-12
  • Published: 1 April 2020
  • Deadline: 15 May 2020; 10:00 hours
  • Time zone: Local Time
  • City: Hanoi
  • Country: Vietnam
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2020-04-02

    Item Description:

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth and cooperation in one of the poorest regions in the world.

    ADB assists its members, and partners, by providing loans, technical assistance, grants, and equity investments to promote social and economic development.

    The Socialist Republic of Vietnam has received financing from the Asian Development Bank (hereinafter called “ADB”) toward the cost of Greater Mekong Sub-region Corridor Town Development Project. Part of this financing will be used for payments under the Contract named above. Bidding is open to Bidders from eligible source countries of ADB.

    The Tay Ninh Province Economic Zone Authority through Tay Ninh Project Management Unit (“the Employer”) invites e-bids from eligible Bidders for the package CW-12: Ben Cau Wastewater Collection Network (“the Works”):

    Description of Works: Construction of Ben Cau Wastewater Collection Network in Ben Cau Town, Tay Ninh Province, Vietnam

    The Civil Works includes main components:

    • Wastewater collection pipelines:
      • Self-flowing pipelines (level 1, 2): HDPE pipe D150 ÷ D400 with a total length of 14,668m and manholes on the route. After detailed surveys, some pipelines going through uninhabited areas may be cut off;
      • Penstocks:HDPE pipes D100÷D200, stainless steel pipes D200(passing bridges) and fittings on pipelines, total length of 1,437m;
      • Level 3 pipeline: D100 uPVC pipe waiting to connect household sand HDPE D150 pipe with a total length of about 11,900m and household junction boxes.
    • Waste water pumping station:
      • Pumping station No.1: Q=105m3 / h,H=35m.
      • Pumping station No.2:Q=45m3 / h,H=10m.

    Completion Period: 365 days

    National Competitive Bidding will be conducted in accordance with ADB’s Single- Stage: One-Envelope bidding procedure and is open to all Bidders from eligible source countries as described in the Bidding Documents.

    Invitation for Bids

    No Tags

      

    Listing ID: 245e865a745208d

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    ADB_Logo

    Design and Construction of Elevated Viaduct and 11 Elevated Stations (inclu...

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]

    2026-07-05

    oecd-logo2

    Energy analysis, data and modelling consistency

    The Organisation for Economic Co-operation and Development (OECD) is looking to perform energy modelling and analysis consistency across the IEA. The deadline for the receipt […]

    2019-04-01

    adb-logo_copy

    Reconstruction of Terminal and other Buildings

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]

    2021-08-23

    Leave a Reply

    You must be logged in to post a comment.

    error: Content is protected !!