Feasibility Studies for Battery Energy Storage Systems Bess and Assessement for a Pumped Storage Hydropower Plant
Item Details:
- Organisation: African Development Bank
- Reference Number: Request for Expressions of interest
- Published: 13 December 2022
- Deadline: 27 January 2023 at 3 p.m.
- Time zone: (GMT+2)
- Street: 1398, Eduardo Mondlane Ave
- City: Maputo
- Country: Mozambique
- Expires: This ad has expired
Item Description:
The African Development Bank Group (AfDB) or Banque Africaine de Développement (BAD) is a multilateral development finance institution. The AfDB was founded in 1964 and comprises three entities: The African Development Bank, the African Development Fund and the Nigeria Trust Fund. The AfDB’s mission is to fight poverty and improve living conditions on the continent through promoting the investment of public and private capital in projects and programs that are likely to contribute to the economic and social development of the region. The AfDB is a financial provider to African governments and private companies investing in the regional member countries (RMC).
Request for Expressions of interest
The Government of Mozambique has received financing from the African Development Bank towards the cost of the Mozambique Renewable Energy Integration Program and intends to apply part of the agreed amount for this grant to payments under the contract for consulting services for the feasibility studies for battery energy storage systems BESS and assessment for a pump storage hydropower plant.
The consultancy services to be provided under this tender, include site identification and full feasibility studies for BESS in 10 sites and assessment for a pumped storage hydropower plant entailing, as a minimum, the following (1) technical viability (2) financial viability (3) environmental impact assessment plant infrastructure and interconnection lines ,(4) adaptation and climate resilience and 5) socio-economic aspects of the proposed technologies in order to guide EDM and other local stakeholders in its decision-making process.
The overall aim of introducing Energy Storage System (ESS) is the need to overcome several challenges related to large-scale grid integration of renewables. First, batteries are technically better suited to frequency regulation than the traditional spinning reserve from power plant. Second, batteries provide a cost-effective alternative to network expansion for reducing curtailment of wind and solar power generation. Third, as renewable power generation often does not coincide with electricity demand, surplus power should be either curtailed or exported. Surplus power can instead be stored in batteries for consumption later when renewable power generation in low and electricity demand increases. Forth, storage systems can make the grid more climate resilient and aid recovery after climate related disasters such as the Cyclone Idai.
The duration of the assignment is approximately 14 months. The consulting firm will be expected to work in close collaboration with EDM and other government and non-government officials during this period.
The EDM now invites eligible consultants to indicate their interest in providing these services. Interested consultants must provide information indicating that they are qualified to perform the services (brochures, description of similar assignments, experience in similar conditions, availability of appropriate skills among staff, etc.). Consultants may constitute joint-ventures to enhance their chances of qualification.
Eligibility criteria, establishment of the short-list and the selection procedure shall be in accordance with the African Development Bank’s “Procurement Policy and Methodology for Bank Group Funded Operations (BPM)” dated October, 2015, which is available on the Bank’s website at http://www.afdb.org.
Interested consultants may obtain further information, including the terms of reference, at the address below during office hours 7:30 AM to 3:30 PM.
Verified user
Related Ads
Some other Request for EOI ads that you might be interested in...
Rental of light/medium/heavy buses with driver at the United Nations Global...
The United Nations Global Service Centre (UNGSC) has identified a requirement for the establishment of a long‐term contract for the provision of rental of light/medium/heavy […]
2022-12-22
Project Implementation Services in the Field of Human Rights for the OSCE M...
Pre-Application Meeting; 19 January 2017, 10:30 a.m. The Human Rights and Democratization (HRD) Program of the OSCE Mission to Moldova seeks NGO partners in the […]
2017-01-05
Provision of rental tents and associated equipment for the UN Headquarters ...
The Procurement Division (PD) of the United Nations Headquarters in New York is seeking to rent tents and associated equipment to be installed at UN […]
2019-06-15
















