Framework market survey concerning the supply of printed circuit boards (PCBs) for the ATLAS Phase-II Upgrade
Item Details:
- Organisation: Conseil Européen pour la Recherche Nucléaire
- Reference Number: MS-4617/EP/ATLAS
- Published: 23-04-2020
- Deadline: Not Specified
- Time zone: Central European Time (CET)
- Street: 385 Route de Meyrin
- City: Meyrin
- Country: Switzerland
- Zip/Postal Code: 1217
- Expires: This ad has expired
Item Description:
CERN intends to place several contracts for the supply of PCBs for the ATLAS Phase-II Upgrade, covering a range of PCB complexities from simple to very complex boards, with many layers, high frequencies and small vias, in a range of different materials. The contracts will be for an initial period of three years, renewable by CERN, and will collectively cover the supply of approximately 4 000 complex PCBs and 20 000 simple PCBs.
Interested firms shall have proven experience and competence in the manufacture and test of PCBs of the complexity required.
Market Survey scheduled for dispatch:
Second quarter 2020
Invitation to Tender scheduled to dispatch:
Third quarter 2020
Contacts and Interest in being contacted:
To express an interest please send an e-mail to procurement.service@cern.ch
Technically: M. Joos Markus.Joos@cern.ch
Commercially: J. Davison joshua.luke.davison@cern.ch
Verified user
Related Ads
Some other Other ads that you might be interested in...
Provision of Core Infrastructure Design, Deployment and Service Transition
The European Bank for Reconstruction and Development (the “EBRD” or the “Bank”) is an international financial institution. The EBRD has its headquarters at One Exchange […]
2020-05-20
Supply including design, installation, testing and commissioning of the new...
CERN intends to place a contract for the design, supply, installation, testing and commissioning of the new cooling stations and the associated chilled water production […]
2019-05-21
Works To Improve The Operation And Prevent Potential Failure Of The Spillwa...
Invitation for Pre-qualification Kariba Dam – Spillway Refurbishment Zambia Works to improve the operation and prevent potential failure of the spillway control facility Loan/Credit No.: […]
2016-12-30
















