Design, Procurement, Construction and Completion of the Sephu Solar PV Power Plant, Bhutan

adb-logo_copy

Item Details:

  • Organisation: Asian Development Bank
  • Reference Number: OCB No: DRE-DB/ 01
  • Published: 8 July 2022
  • Deadline: 19 September 2022, 13:00 hours
  • Time zone: Bhutan Standard Time
  • City: Thimphu
  • Country: Bhutan
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2022-07-08

    Item Description:

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth and cooperation in one of the poorest regions in the world.

    ADB assists its members, and partners, by providing loans, technical assistance, grants, and equity investments to promote social and economic development.

    Invitation for Bids

    The Royal Government of Bhutan has applied for financing from the ADB towards the cost of Renewable Energy for Climate Resilience Project. Part of this financing will be used for payments under the Contract named above. This contract will be jointly financed by the Royal Government of Bhutan and ADB. Bidding is open to Bidders from eligible source countries of ADB.

    The Department of Renewable Energy under the Ministry of Economic Affairs (“the Employer”) invites sealed bids for the design, procurement, construction and completion of the Sephu Solar PV Power Plant, Bhutan (“the Facilities”). The Facilities comprise the Main Electrical System including solar PV modules, inverters, cables, transformers, and protection equipment, Solar PV Module Mounting Structures, Site Access and Internal Roads, Buildings and Civil Works, Drainage Systems, Water Supply System, Lightning Protection System, External Lighting System, Earthing System, Fire Fighting and Detection System, Emergency Generator, Supervisory Control and Data Acquisition (SCADA), Power Plant Communication, Weather Station, Administrative and control building. The overall completion time for designing, planning, engineering, procurement (manufacturing/supply), construction/erection, testing, and commissioning of the solar PV power plant in Sephu is 540 days.

    Open Competitive Bidding (International Advertisement) will be conducted in accordance with ADB’s Single-Stage: Two-Envelope procedure and is open to all Bidders from eligible source countries as described in the Bidding Document.

    Invitation for Bids

    No Tags

      

    Listing ID: 8762c845671fb16

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    AfDB_Logo

    Acquisition d’équipements pour les unités de transformation au profit...

    Le Groupe de la Banque africaine de développement (BAD) est une institution multilatérale de financement du développement dont le siège est à Abidjan, en Côte […]

    2023-01-06

    eu-logo

    Evaluation of Investments in Research and Technological Development (RTD) I...

    Directorate-General for Regional and Urban Policy DG REGIO intends to launch an ex post evaluation on investment projects in Research and Technological Development (RTD) infrastructures, […]

    2019-02-07

    eu-logo

    Provision of Travel Agency and Event Organisation Services for EFCA and EU-...

    The European Fisheries Control Agency (EFCA) is a European Union agency. The agency’s mission is to promote the highest common standards for control, inspection and […]

    2018-10-03

    Listing Opportunities

    Featured Tender

    Innovative Solutions

    error: Content is protected !!