Welcome, visitor!   Login

Menu Post an Ad

Invitation for Prequalification – Dushanbe – Uzbekistan Border Road Improvement Project (Cofinanced with the European Bank for Reconstruction and Development)

AIIB-logo-640x436

Item Details:

  • Organisation: Asian Infrastructure and Investment Bank
  • Reference Number: Dushanbe - Uzbekistan Border Road Improvement Project
  • Published: 6 December 2016
  • Deadline: 18 January 2017 at 10:00 a.m.
  • Time zone: local Tajikistan time
  • City: Dushanbe
  • Country: Tajikistan
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2017-01-06

    Item Description:

    This Invitation for Prequalification follows the General Procurement Notice for this project which was published on the EBRD website, Project Procurement Notices, on 29 April 2016 (http://www.ebrd.com/work-with-us/procurement/p-pn-160429a.html).

    The Ministry of Transport of the Republic of Tajikistan, hereinafter referred to as “the Client”, intends using part of the proceeds of a loan from the Asian Infrastructure Investment Bank, hereinafter referred to as “the Bank”, and from the European Bank for Reconstruction and Development towards the cost of Dushanbe – Uzbek border Road Improvement Project.

    Invitation for Prequalification – Dushanbe – Uzbekistan Border Road Improvement Project (Cofinanced with the European Bank for Reconstruction and Development)

    No Tags

      

    Listing ID: 127586f286be97a3

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    CERN

    Supply of the disassembly and reassembly works of building 662 on the Swiss...

    CERN intends to place a contract for the disassembly and reassembly works of building 662 (460 m2) on the Swiss part of the CERN Meyrin […]

    2019-03-19

    CERN

    Supply and refurbishment of personnel lifts up to 3 ton capacity

    CERN intends to place a contract for the supply or refurbishment of an estimated quantity of ten obsolete personnel lifts up to 3 ton capacity. […]

    2021-07-24

    CERN

    Supply of PXIe High Availability Chassis for the LHC Collimators controls u...

    CERN intends to place a contract for the supply of 200 PXIe High Availability Chassis, including design, prototyping, manufacturing of pre-series and series and delivery. […]

    2019-09-07

    Leave a Reply

    You must be logged in to post a comment.

    error: Content is protected !!