Welcome, visitor!   Login

Menu Post an Ad

Provision of BMC Control-M workflow automation services

ebrd-logo copy

Item Details:

  • Organisation: European Bank for Reconstruction and Development
  • Reference Number: PUR1904/11
  • Published: 20 May 2019
  • Deadline: 28 Jun 2019 at 17:00 hours
  • Time zone: London local time
  • Street: One Exchange Square
  • City: London
  • Country: United States of America
  • Zip/Postal Code: EC2A 2JN
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2019-05-30

    Item Description:

    The European Bank for Reconstruction and Development (EBRD) is seeking submissions from interested parties for the provision of BMC Control-M Dev Ops.

    The Request for Propsoals (RFP) attached to this procurement notice details the full scope of requirements, a description of the process, the timetable, and the sole contact person.

    Please read and follow carefully all of the instructions provided in the RFP document which is downloadable by clicking the below link:

    RFP document

    No Tags

      

    Listing ID: 3155cf050bc73fd9

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    adb-logo_copy

    Procurement of Equipment and Goods for World Skill Centre at Bhubaneswar, O...

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]

    2020-10-10

    eu-logo

    Provision of Legal Services to Cedefop

    Cedefop is planning to award a contract resulting from the above procurement procedure. The procurement documents consist of the contract notice, the invitation letter, the […]

    2019-06-11

    eu-logo

    Security Services for the Delegation of the European Union to Sri Lanka and...

    The European Union, represented by the European Union Delegation to Sri Lanka and the Maldives, referred to below as the contracting authority, is planning to […]

    2021-05-28

    Leave a Reply

    You must be logged in to post a comment.

    error: Content is protected !!