Welcome, visitor!   Login

Menu Post an Ad

Supply and installation of substation and connection line equipment and materials (transformers supplied under another package) for the 110kV Phuoc Long substation and connection line

adb-logo_copy

Item Details:

  • Organisation: Asian Development Bank
  • Reference Number: ADB-EVNHCMC-PL-G01
  • Published: 23 October 2020
  • Deadline: 19 November 2020, 10:00 hours
  • Time zone: Local time
  • City: Hanoi
  • Country: Vietnam
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2020-10-25

    Item Description:

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth and cooperation in one of the poorest regions in the world.

    ADB assists its members, and partners, by providing loans, technical assistance, grants, and equity investments to promote social and economic development.

    The Social Republic of Vietnam has received financing from the Asian Development Bank (ADB) toward the cost of the Ha Noi and Ho Chi Minh City Power Grid Development Sector Project, and it intends to apply part of the proceeds of this financing to payments under the contract named above. Bidding is open to Bidders from eligible source countries of ADB.

    The Branch of Ho Chi Minh City Power Corporation – Ho Chi Minh City Power Project Management Board (PPMB for short) (the “Purchaser”) invites online bids from eligible Bidders for the Supply and installation of substation and connection line materials and equipment (transformers supplied under another package) for the 110kV Phuoc Long substation and connection line (the “Goods”) with the following details:

    • 110kV SF6 gas insulated switchgears (GIS) with aluminum alloy shell.
    • 160kVA 22/0.4kV dry type 3-phase Auxiliary transformer.
    • 22kV distribution system and switchgears.
    • 22kV capacitor banks.
    • 22kV power cable.
    • Telecommunication system and SCADA.
    • 110kV connection line (02-circuit overhead line and 02-circuit underground cable).
    • 380/220VAC, 110VDC, 48VDC auxiliary power supply.
    • Make a calculation table for the whole substation value; Make an energizing method; Testing and commissioning (transformers supplied under another package).
    • Final Destination: 110kV Phuoc Long substation and connection line at Phuoc Long B Residential Area, Phuoc Long B Ward, District 9, Ho Chi Minh City.
    • Completion period: 240 days.

    National Competitive Bidding will be conducted in accordance with the ADB’s Single Stage – One Envelope bidding procedure and is open to all eligible Bidders as described in the Bidding Document.

    Invitation for Bids

    No Tags

      

    Listing ID: 125f950301dbc05

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    AIIB-Logo4

    Chennai Metro Rail Phase 2 Project – Balance Corridor 5

    The Asian Infrastructure Investment Bank (AIIB) is a multilateral development bank with a mission to improve social and economic outcomes in Asia. Headquartered in Beijing, […]

    2020-04-27

    eu-logo

    Provision of Content Support Services

    The European Training Foundation (ETF) is planning to award the contract resulting from the above procurement procedure. The procurement documents consist of the contract notice, […]

    2021-11-05

    FAO-logo

    Procurement of 995 Centrifugal water motor pumps on petrol fuel (with acces...

    The Food and Agriculture Organization of the United Nations (FAO) invites you to submit an offer for the procurement of 995 Centrifugal water motor pumps […]

    2020-10-18

    Leave a Reply

    You must be logged in to post a comment.

    Listing Opportunities

    Featured Tender

    Innovative Solutions

    error: Content is protected !!