Welcome, visitor!   Login

Menu Post an Ad

Supply, install and commission Load shifting battery at ‘the Villa’

adb-logo_copy

Item Details:

  • Organisation: Asian Development Bank
  • Reference Number: TREP-02
  • Published: 11 February 2019
  • Deadline: 26 March 2019, 2:00 P.M.
  • Time zone: Tonga Time
  • Street: Corner Taufa’ahau and Mateialona Roads
  • City: Nuku’alofa
  • Country: Tonga
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2019-02-11

    Item Description:

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth and cooperation in one of the poorest regions in the world.

    ADB assists its members, and partners, by providing loans, technical assistance, grants, and equity investments to promote social and economic development.

    Tonga has applied for financing from the ADB toward the cost of Renewable Energy Project. Part of this financing will be used for payments under the contract named above. This contract will be jointly financed by the Green Climate Fund (GCF) and ADB. Procurement rules and procedures of ADB will govern the bidding process. No nationality restrictions apply other than any restriction arising from Instruction to Bidders Clause 4.

    The Tonga Power Limited (“the Employer”) invites sealed bids from eligible Bidders for the design, construction, installation, integration in the existing power system infrastructure and commission of a battery energy storage system (BESS)

    (“the Facilities”) as shown below:

    Load shifting battery at ‘the Villa’ – supply, install and commission

    (i) A BESS to be installed at the “The Villa” adjacent existing 2 MW solar field and TPL Offices, on the island of Tongatapu and connected to the electricity grid. The BESS is intended to provide increased flexibility for TPL to manage the output of multiple independent power producers operating wind and solar installations at various locations around the island. The project will facilitate increasing capacity of renewable generation in the grid by storing solar generation during the day for use at night, and grid providing support to the power station and power station BESS (separately tendered).

    (ii) The BESS shall provide and include:

    • a fully integrated, modular system, suitable for extended service in local conditions.
    • usable storage capacity of 17.4 MWh.
    • capability to charge and discharge at 5.1 MW.
    • high voltage (11 kV) electrical connection to the grid.
    • interface to the TPL SCADA.
    • Grid support functionality.

    Invitation for Bids

    No Tags

      

    Listing ID: 4095c61df255a494

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    AIIB-Logo4

    Provision of M365 related development service

    The Asian Infrastructure Investment Bank (AIIB) is a multilateral development bank with a mission to improve social and economic outcomes in Asia. Headquartered in Beijing, […]

    2022-06-07

    ADB_Logo

    Procurement of Electrical Technology Equipment and Tools (Electrician, DAE ...

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]

    2026-03-30

    adb-logo_copy

    Augmentation of Transmission Lines in CEB Transmission Network Supply and d...

    The Asian Development Bank (ADB) was conceived in the early 1960s as a financial institution that would be Asian in character and foster economic growth […]

    2021-09-23

    Leave a Reply

    You must be logged in to post a comment.

    error: Content is protected !!