Welcome, visitor!   Login

Menu Post an Ad

Construction of Giresun Wastewater Treatment Plant & Wastewater Collection System

eu-logo

Item Details:

  • Organisation: European Union
  • Reference Number: NEAR/ANK/2020/EA-OP/0030
  • Published: 11/12/2020
  • Deadline: 23/03/2021 at 14:00 hours
  • Time zone: Local time
  • City: Ankara
  • Country: Turkey
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2020-12-15

    Item Description:

    The mission of the Directorate-General for Neighbourhood and Enlargement Negotiations (DG NEAR) is to take forward the EU’s neighbourhood and enlargement policies, as well as coordinating relations with EEA-EFTA countries insofar as Commission policies are concerned. DG NEAR works closely with the European External Action Service and the line DGs in charge of thematic priorities.

    By implementing assistance actions in Europe’s eastern and southern neighbourhood, DG NEAR supports reform and democratic consolidation, and strengthens the prosperity, stability and security around Europe. DG NEAR helps to promote EU values, policies and interests in this region, and to contribute to developing the special relationship of the EU with its neighbouring countries.

    Subject of the contract

    The subject of the contract is the Construction of Giresun Wastewater Treatment Plant & Wastewater Collection System.

    Lot 1: Construction of Giresun Wastewater Treatment Plant:

    The Giresun wastewater treatment plant will be an activated sludge plant with nutrient removal and anaerobic stabilisation of sludge generated in the activated sludge tanks.The Giresun WWTP will be planned, designed, constructed and equipped for satisfy the needs in Stage 2. The second stage of the treatment plant is planned to serve to approximately 114 178 p.e. The works for discharge line to Blacksea is also included in the scope. The lot 1 work will be implemented under FIDIC Conditions of Contract for Plant and Design-Build (Yellow Book First Edition 1999). This contract includes the design of the first and second stages of the wastewater treatment plant and construction of the units for first stage and second stage as appropriate. Additionally the contractor will also be responsible for start-up of the plant, commissioning, operational training of the end recipient’s personnel, and hand-over to the Municipality of the complete wastewater treatment plant ready for operation.

    Lot 2: Construction of Giresun Wastewater Collection System:

    The scope of lot 2 work can be summarised as: construction of approximately 24 km of wastewater collectors and sewerage network pipelines, construction of approximately 4.7 km forced mains and associated structures, supply, installation and construction of wastewater house connection pipes, parcel manholes and manholes, construction of three new wastewater pumping stations (Aksu, Boğacık, Saz), construction and installation of four new package type wastewater pumping stations (TM2, Küçükköy, Eriklimanı, Göksüz), construction of approximately 3.2 km highway, railway, river/creek, culvert, etc. crossing by horizontal directional drilling method and construction of one creek crossing by hanging pipe on bridge, installation of automation system for the pumping stations and preparation of wastewater collection system network as-built plans for constructed sewer mains. The lot 2 work will be implemented under FIDIC Conditions of Contract for Construction for Building and Engineering Works Designed by the Employer (Red Book First Edition 1999).

    Download all available documents in: [ZIP] English (en)

    No Tags

      

    Listing ID: 6975fd8c45197ebc

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    afdb-logo2

    Supply, Installation, Configuration, Maintenance and Training for a Custome...

    1)  The African Development Bank (hereafter referred to as “The Bank”) intent to select a company for the supply, design, installation, implementation, migration, support, and […]

    2018-11-06

    AfDB_Logo

    Implémentation d’un système de cadastre minier et de geodonnées

    Le Groupe de la Banque africaine de développement (BAD) est une institution multilatérale de financement du développement dont le siège est à Abidjan, en Côte […]

    2022-09-26

    ebrd-logo copy

    Procurement of radio modules and cold water meters, pre-equipped and equipp...

    This Invitation for Tenders follows the General Procurement Notice for this project which was published on the European Bank for Reconstruction and Development (the Bank) […]

    2019-01-18

    Leave a Reply

    You must be logged in to post a comment.

    Listing Opportunities

    Featured Tender

    Innovative Solutions

    error: Content is protected !!