Prequalification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station – LOT 2 Compression Train 7, including WHRU and ORC technologies, O&M training and spare parts

ebrd-logo copy

Item Details:

  • Organisation: European Bank for Reconstruction and Development
  • Reference Number: 9512-PRE-48901
  • Published: 23 Sep 2019
  • Deadline: 22 Oct 2019 at 11:00 hours
  • Time zone: Local time
  • Street: Maadi Ring Road, Exist 12, 90th Street, Fifth Settlement, New Cairo
  • City: Cairo
  • Country: Egypt
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2019-09-26

    Item Description:

    The European Bank for Reconstruction and Development (EBRD) is an international financial institution that supports projects in over 30 countries, from Eastern Europe to central Asia and the southern and eastern Mediterranean. Investing primarily in private sector clients whose needs cannot be fully met by the market, the Bank promotes entrepreneurship and fosters transition towards open and democratic market economies. Further information about the EBRD’s roles and activities can be found on the EBRD’s website: http://www.ebrd.com.

    The EBRD is owned by 65 countries and two intergovernmental institutions, the European Union and the European Investment Bank (EIB). The EBRD has certain privileges and immunities such as exemption from Taxation, customs charges with all official correspondence being granted diplomatic immunities and privileges.

    Invitation for Prequalification

    This Invitation for Prequalification follows the General Procurement Notice for this project, which was published, on the EBRD website, Project Procurement Notices (https://www.ebrd.com/work-with-us/procurement/p-pn-181107a.html) on 7 November 2018.

    GASCO, hereinafter referred to as “the Client”, intends, using part of the proceeds of a Loan from European Bank for Reconstruction and Development, hereinafter referred to as “the Bank” towards the cost of EGAS Energy Efficiency project, to extend capacity of existing Dahshour compression station by about 500 MMSCFD.

    Dahshour existing compression station, commissioned in 2012, is composed of four turbo compressor packages (3 in operation and 1 stand-by), designed to receive 979 MMSCFD of gas from the national gas network at a pressure and temperature ranging respectively from 25.3 to 50 bara and 15 to 33°C, in order to pressurize the gas up to 71 bara, to be directed into the Assuit / Aswan pipeline via the existing Dahshour/El Koraimat 36″ P/L. Each existing compression train is consisting of one single-stage compressor driven by gas turbine, suction drum and after cooler. The gas outlet temperature from compression train is about 55°C.

    Gasco has already planned to add one new turbo-compressor (train 5), two electrical motor driven compressor trains (train 6 A/B) and 2 x 50% Organic Ranking cycles to recover the waste heat energy from the existing and the new gas turbine.

    The turbo-compressor Train 5 is sized to receive a feed of 326 MMSCFD @ 25.2 bara and 33°C @ battery limit, each electrical motor driven compressor trains (Train 6 A/B) is sized to receive a feed of 163 MMSCFD @ 25.2 bara and 33°C @ battery limit., the ORC is designed to recover the heat from 4 turbo-compressor simultaneously in configuration 2×50%, each ORC turbines, reference power 12 MW, is connected to two generators delivering electric power.

    In order to meet the increasing demand, Gasco plans further Gas compression station extension. It will be a separate plant adjacent to the existing one.  It shall include the following items (or equivalent):

    1. Adding one new turbo-compressor Train 7 sized to receive a feed of 326 MMSCFD @ 25.2 bara and 33°C @ battery limit,
    2. Adding one new electrical motor driven compressor trains (Train 10A) sized to receive a feed of about 163 MMSCFD @ 25.2 bara and 33°C @ battery limit.
    3. Adding one new ORC system installed to recover heat from turbo-compressor(s).  The ORC shall be sized to provide the power for the electric gas compressor 10A.

    The ORC system shall be sized, designed and supplied to recover the waste heat energy by exchanging heat in the stack between the exhaust and thermal oil through a “Hot Thermal Oil Circulation System”, and then this heat is transferred to an ORC package. Organic Rankine Cycle (ORC) utilizes the heat energy in the GTG exhaust to heat an Organic fluid to a superheated vapor state in an evaporator.  The Organic fluid then expands in ORC turbine(s) connected to generator(s) delivering electric power. The organic fluid then condenses in an air-cooled condenser, and then is pumped again to the evaporator to complete the cycle. Recuperators, economizers, regenerators…etc. shall be installed in the ORC system, as deemed necessary by ORC supplier, to enhance the heat recovery effort.

    Applicants, solely or through JV, to quote for the following scope of the Contract:

    Engineering, Design, Manufacture, fabrication, test and supply of:

    • One API 617 Centrifugal Compressor Driven by heavy-duty industrial type, non-aeroderivative API 616 Gas Turbine and related auxiliaries, monitoring and control systems,
    • One API 617 Centrifugal Compressors Driven by Medium Voltage Electric Motors complete with MV Variable speed drive and related auxiliaries, monitoring and control systems,
    • Balance of Plant for Compressor train(s) including but not limited to: ASME Code U stamped Suction Knock Out Drums, API 661 Gas After coolers, all interconnecting piping, pipe rack, pipe supports, compressor’s Yard valves, Blow down valves, shutdown valves, all Control and Instrumentation, electrical switchgear of MV and LV MCC, the MV switchgear shall be composed of at minimum two incoming motorized circuit breakers and two outgoing motorized circuit breakers including all associated power supply requirements from the generators driven by the ORC and the backup power supply by the utility grid, electrical and Instrumentation cables, all Fire-fighting requirements covering the alarm and detection system plus the fighting equipment, the equipment needed for tie in between the gas compressors inlet/outlet to the assigned point of coupling by the owner,
    • New Master Control Panel for new trains added to Dahshour Compression station.
    • Waste heat exchangers of circular concentric helical coil type (as a preference, or equivalent), twin stack type, with separate bypass stack and diverter damper fitted to the exhaust of the turbo-compressor unit n. 7.
    • Intermediate Thermal oil system including hot oil interconnecting piping, API 610 hot oil recirculation pumps.
    • High temperature Organic Rankine Cycle system generating Medium voltage electricity, including but not limited to: ORC turbine(s) complete with all Balance of plant such as organic fluid Air cooled condensers, hot oil/ Cyclopentane evaporators, recuperators, pre-heaters, API 610 Cyclopentane recirculation pumps, all Cyclopentane interconnecting piping, electrical and Instrumentation cables.
    • Air Conditioned Pre-Fabricated Power Module housing (Power Management system, MV electrical switchgear and LV MCCs, AC/DC UPSs, ORC control system…etc).
    • Step up Power Transformer 11 kV/22 kV.
    • Gas connections, production of utilities for the plant extension, with safety systems (fire & gas, fire fighting)
    • Technical studies and calculations including but not limited to: HYSIS based Dynamic simulation study for compressor trains, lateral and Torsional analysis for the compressor train, dynamic simulation study for compressor train implementing its outcomes (hot gas bypass for example).
    • Electrical studies including but not limited to: Transient stability study, Harmonic analysis study, power system study, etc.
    • Equipment Performance Testing in accordance to relevant ASME PTC codes and API Standards.
    • Site supervision during construction, pre-commissioning, commissioning and start up phases.
    • Site training for operators, up to 12 months on site operator assistant service.

    Prequalification and tendering for contracts to be financed with the proceeds of a Loan from the Bank is open to firms and joint ventures of firms from any country.

    Prequalification documents may be obtained from the office at the address below or in electronic format free of charge.

    Kindly note that Invitations for three (3) “Prequalification Documents for EGAS Energy Efficiency Project in Dahshour Compression Station” lots are published simultaneously (Lot2, Lot5 and Lot6). Hence, Applicants are free to apply to qualify for more than one lot if appropriate, which would mean that accumulated amounts and requirements as per Prequalification Data Sheet (PDS), clause 22.1 need to be observed.

    The prequalification documents must be duly completed and delivered to the address below, on or before 22 October, 2019, by 11:00 AM Egypt time. Documents which are received late may be rejected and returned unopened.

    Interested firms may obtain further information from, and inspect and acquire the prequalification documents at the following office:

    Contact person: Nermeen Abdalla
    Executing Agency: GASCO
    Street Address: Maadi Ring Road, Exist 12, 90th Street, Fifth Settlement, New Cairo – Egypt
    City: Cairo
    Postal Code: 11835
    Country: Arab Republic of Egypt
    Phone number: + (202) 26187022
    E-mail address: nermeen_abdalla@gasco.com.eg

    No Tags

      

    Listing ID: 4755d8d676d3f410

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    worldbank_logo3

    Computer Telephony Integration (CTI) Solution

    The objective of this REI is to prequalify Firms for a subsequent RFP for Computer Telephony Integration (CTI) Solution for multiple help desk teams in […]

    2019-09-02

    oecd-logo2

    Consultant to support Health System Performance Assessment framework for Es...

    The Organisation for Economic Co-operation and Development (OECD), an intergovernmental organisation headquartered in Paris (France), is launching this Market Consultation in order to source an […]

    2021-08-17

    CERN

    Supply of travel management and online booking tool services

    CERN intends to place a contract for the supply of travel management services for flights, car rental, trains and hotels, including an online booking tool […]

    2022-07-19

    Leave a Reply

    You must be logged in to post a comment.

    Listing Opportunities

    Featured Tender

    Innovative Solutions

    error: Content is protected !!