Welcome, visitor!   Login

Menu Post an Ad

Supply of approximately 800 high-quality, radiation-tolerant 3D silicon pixel sensors for the Phase-2 upgrade of the CMS Inner Tracker.

CERN

Item Details:

  • Organisation: Conseil Européen pour la Recherche Nucléaire
  • Reference Number: MS-4526/EP/CMS
  • Published: 27-05-2019
  • Deadline: Not Specified
  • Time zone: Central European Time (CET)
  • Street: 385 Route de Meyrin
  • City: Meyrin
  • Country: Switzerland
  • Zip/Postal Code: 1217
  • Expires: This ad has expired

Email to a friend

← Go Back
  • Item listed by: on 2019-05-28

    Item Description:

    CERN intends to place a contract for the supply of approximately 800 single-sided 3D silicon pixel sensors fabricated on high resistivity p-type substrate, for the Phase-2 upgrade of the CMS Inner Tracker. The supply shall be delivered in the period between October 2021 and August 2023. Main features include: -Active thickness: 150 microns (um); -Maximum physical thickness: 270um; -Pixel cell size: either 50um x 50um or 25um x 100um; -Bump-bonding pattern: 50um x 50um; -Sensors array: 864 x 336 pixel cells; -Sensor size: ~44.35mm x 17.70mm. Sensors shall remain highly efficient and dissipate low power after irradiation to fluences of approximately 2e16 Neq/cm2. Breakdown voltage before irradiation shall exceed the full depletion voltage by at least 20V.

    Interested firms shall have proven competence and experience in 3D silicon pixel fabrication.

    Market Survey scheduled for dispatch:

    Second quarter 2019

    Invitation to Tender scheduled to dispatch:

    First quarter 2021

    Contacts and Interest in being contacted:

    To express an interest please send an e-mail to procurement.service@cern.ch
    Technically: G. Gomez Gervasio.Gomez@cern.ch
    Commercially: C. Carayon charles.carayon@cern.ch

    No Tags

      

    Listing ID: 8135ced4ab8c3af5

    Report problem

    Processing your request, Please wait....

    Verified user

    Sponsored Links

    Related Ads

    Some other ads that you might be interested in...

    CERN

    Supply of PXIe High Availability Chassis for the LHC Collimators controls u...

    CERN intends to place a contract for the supply of 200 PXIe High Availability Chassis, including design, prototyping, manufacturing of pre-series and series and delivery. […]

    2019-09-07

    CERN

    Supply of ventilation and automation works for the renovation of CERN Hoste...

    CERN intends to place a contract for the ventilation and automation works for in the framework of the general safety upgrade and renovation of sanitary […]

    2019-10-31

    ebrd-logo copy

    Construction Supervision and Project Management Services for the Project

    This Invitation for Expression of Interest follows the General Procurement Notice published in the OJEU 2017/S 180-367819 and on the EBRD’s website on 14 September […]

    2019-01-05

    Leave a Reply

    You must be logged in to post a comment.

    Listing Opportunities

    Featured Tender

    Innovative Solutions

    error: Content is protected !!