Supply of CERN standard pre-fabricated concrete blocks and beams
Item Details:
- Organisation: Conseil Européen pour la Recherche Nucléaire
- Reference Number: MS-4628/EN
- Published: 11-06-2020
- Deadline: Not Specified
- Time zone: Central European Time (CET)
- Street: 385 Route de Meyrin
- City: Meyrin
- Country: Switzerland
- Zip/Postal Code: 1217
- Expires: This ad has expired
Item Description:
CERN intends to place two five-year blanket purchase contract for shielding blocks. The CERN standard blocks are composed of ten types of blocks, from 20 kg to 7 t 5 (20kg; 160 kg; 325 kg; 630 kg; 1250 kg; 1250 kg; 2500 kg; 7200 kg; 7500 kg), with cylinder shape. The CERN standard beams are composed of height type of blocks, from 2.5 t to 7 t 5 (2500 kg; 3150 kg; 3750 kg; 5000 kg; 6300 kg; 7500 kg), with parallelepiped shape.
Interested firms shall have a proven experience and competence in the field of pre-fabricated concrete blocks.
Market Survey scheduled for dispatch:
Third quarter 2020
Invitation to Tender scheduled to dispatch:
Fourth quarter 2020
Contacts and Interest in being contacted:
To express an interest please send an e-mail to procurement.service@cern.ch
Technically: M. Lazzaroni Michael.Lazzaroni@cern.ch
Commercially: B. Jenssen Bjorn.Jenssen@cern.ch
Verified user
Related Ads
Some other Other ads that you might be interested in...
Framework Market Survey concerning the supply of general civil engineering ...
CERN intends to place several contracts for civil engineering works for the construction of new structures and industrial building on the French and/or on the […]
2019-03-16
Supply of 350 VMEbus Subracks for the CERN Accelerator Control System
CERN intends to place a five-year contract for the supply of three types of VME64x subracks (2-, 6- and 17-slot) with remote monitoring and control […]
2019-03-27
Supply including design, installation, testing and commissioning of SD, SU ...
CERN intends to place four contracts. Two contracts will cover the design, supply, installation and commissioning of ventilation systems for the High Luminosity project at […]
2020-04-15
















